  1. Establish administrative set up

  2. Arrange accommodation

  3. Appoint support staff

  4. Prepare DPR

  5. Set up project Website

  6. Design and assemble prototype MeLTs

  7. Set up procedures

  8. Need Assessment

  9. Arrange content

  10. Procurement

  11. Finalize Hub Earth Stations and arrange bandwidth

  12. Fabricate MeLTs

  13. Recruit staff for MeLTs

  14. Deploy MeLTs

  15. Get Feed back and prepare road map

   End of Project

Top...

 
 Activities
 
  1. Establish Administrative Set up
bullet Formation of Core Group
bullet Form Project Purchase Committee
bullet Form Project Monitoring Committee
bullet Get Internal Approvals
 
  1. Arrange Accommodation
bullet Office
bullet Stores
 
  1. Appoint Support Staff
bullet Identify Account Person
bullet Identify Administrative Staff
bullet Identify Technical Staff
bullet Support Project Staff
bullet Appoint Research Staff
 
  1. Prepare DPR
bullet First Draft
bullet Second Draft
bullet Third Draft
bullet Finalize Report
 
  1. Set up Project Website
bullet First Version
bullet Second Version
bullet Third Version
bullet Finalize Website
bullet Register Domain Name
bullet Launch WebsiteSecond Draft
 
  1. Design and assemble prototype MeLTs
bullet Design Van based Design MeLT
bullet Finalize the type and model of van
bullet Finalize the design of LAN of van
bullet Finalize the bill of material for the van
bullet Finalize the internal wiring of van
bullet Finalize design of customised body of van
bullet Assemble mock van
bullet Approval of mock van
bullet Finalize size and type of antenna
bullet Design antenna support & control fixtures
 
bullet Design Bus-based MeLT
bullet Finalize the type and Model of bus
bullet Finalize the design of LAN of bus
bullet Finalize the bill of material for the bus
bullet Finalize the internal wiring of bus
bullet Design customized body of bus
 
bullet Procurement for Prototypes
bullet Purchase Van
bullet Purchase Bus
bullet Purchase servers
bullet Purchase laptops
bullet Purchase network components
bullet Purchase AV equipment
bullet Purchase furniture
bullet Fabricate storage racks and bags
 
bullet Fabricate van-based MeLT
bullet Fabricate body
bullet Fabricate antenna fixture for van
bullet Install antenna
bullet Install storage racks
bullet Do internal wiring
bullet Assemble all parts
bullet Test all systems of van
 
bullet Fabricate bus-based MeLT
bullet Fabricate Customise body
bullet Fabricate antenna fixture for bus
bullet Install antenna
bullet Do internal wiring
bullet Assemble all parts
bullet Test all systems of bus
 
bullet Approval of prototypes
bullet Approval of prototype van-based MeLT
bullet Approval of prototype bus-based MeLT
 
  1. Set up Procedures
bullet For selection of states / area / institute
bullet For networking of institute
bullet For Deployment of MeLTs
bullet For O & M of MeLTs
 
  1. Need Assessment
bullet Identify states and Uts for pilot
bullet Develop Survey Methodology
bullet Identify survey parameters
bullet Finalized survey methodology
bullet Workshop for Training of Trainers
bullet Workshop for Training of surveyers
bullet Carry out field survey
bullet Identify remote area for pilot in each state
bullet Asses needs of areas
bullet Finalize agreements with networked in institute
bullet Workshop to consider findings of 8.3, 8.4 and 8.5
 
  1. Arrange content
bullet Identify content for the area
bullet Identify sources for provision of content
bullet Classify contents
bullet Arrange (Procure) CDs
 
  1. Procurement
bullet Procure vehicles
bullet Purchase Vans
bullet Purchase Buses
bullet Procure common equipments
bullet Purchase VSAT equipment
bullet Purchase servers
bullet Purchase laptops
bullet Purchase network components
bullet Purchase AV equipment
bullet Purchase Alternators
bullet Purchase GPS
 
  1. Finalize Hub Earth Stations and Arrange Bandwidths
bullet Identify Edusat Hub Earth Stations
bullet Identify other Hub Earth Stations
bullet MoU with Edusat Hub Owners
bullet Contact with Other Hub Earth Stations
 
  1. Fabricate MeLTs
bullet Fabricate Vans
bullet Fabricate buses
 
  1. Recruit staff for MeLTS
bullet Drivers
bullet Operators
 
  1. Deploy MeLTs
 
  1. Get feed back and prepare road map
bullet Feed back from MeLT staff
bullet Feedback from other schools / colleges
bullet Feed back from students
bullet Feedback from public
bullet Prepare Road Map